User Tools

Site Tools


scheduling

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
scheduling [2020/03/11 17:12]
root
scheduling [2020/03/11 17:13] (current)
root
Line 9: Line 9:
  
 The scheduler does not check which nodes are busy and try to avoid them. This has an advantage in that it tends to leave some nodes empty for people who need a whole node. The scheduler does not check which nodes are busy and try to avoid them. This has an advantage in that it tends to leave some nodes empty for people who need a whole node.
- 
-See also the [[Running Many Jobs]] page. 
  
scheduling.1583961174.txt.gz ยท Last modified: 2020/03/11 17:12 by root